An argument to increase the design loads of timber piles.
|
|
|
|
|
|
Matching the structural pile capacity of a concrete pile to the geotechnical capacity for an efficient design.
|
|
|
|
|
|
The use of steel sheet pile as excavation support and permanent foundation walls is discussed.
|
|
|
|
|
|
Secant drilled shaft wall with estimated cost of over $15 million was replaced by innovative driven pile solution costing only $2 million.
|
|
|
|
|
|
Drilled shaft work proposal requiring 60 nights of constant noise was replaced by only 9 days of driven piles during normal working hours.
|
|
|
|
|
|
Large bridge designed for drilled shafts is switched to driven piles; testing advantage of driven.
|
|
|
|
|
|
A review of the quality that goes into all types of driven piles: timber, concrete, and steel sections.
|
|
|
|
|
|
Driven piles are the foundation of choice over drilled shafts for wind farm turbine installations in Europe.
|
|
|
|
|
|
Driven pile noise and vibration issues are overcome by test program and working closely with the engineer; installation completed in 3 days rather than the planned 10 days.
|
|
|
|
|
|
General overview of oldest, yet still viable, driven pile type.
|
|
|
|
|
|
Another driven pile advantage for lateral loads and how to make a proper design even in seismic conditions.
|
|
|
|
|
|
When properly designed, concrete piles can be used for seismic applications.
|
|
|
|
|
|
Overall descriptions of prestressed concrete piles with benefits are presented.
|
|
|
|
|
|
Driven piles were used in an historic district near a hospital and overcame all vibration and noise issues.
|
|
|
|
|
|
Driven piles chosen over augercast and drilled shafts because of the economy and reliability of driven piles.
|
|
|
|
|
|
Describes the process and differences among various available pipe pile options.
|
|
|
|
|
|
Explains the need and proper use of cushions to protect concrete piles during driving.
|
|
|
|
|
|
Augercast piles successfully replaced by driven piles; noise and vibration issues in old historic district easily solved.
|
|
|
|
|
|
Author’s research clearly shows superiority of driven piles in brownfield sites.
|
|
|
|
|
|
What are they and what they do.
|
|
|
|
|
|
Innovative test program saved time and money.
|
|
|
|
|
|
Take advantage of the testing commonly performed on driven piles; save money and reduce risk.
|
|
|